Background

University of Nottingham operate three large campuses, plus a variety of buildings on external sites, including three sports grounds, buildings at hospitals in Nottingham and Derby, and a Further Education complex in Nottingham city centre.Water services are metered throughout the property portfolio. Estate management became concerned at the cost of metered water & sewerage, and instigated a project to review water consumption with the aim of making substantial reductions. An element of this project focussed on urinal flushing; Estate Office staff were aware that there were a variety of different makes and models of flush control devices already in situ, but that there were also a number of uncontrolled auto-flush cisterns. However, there was no record of where all of the Gents toilets were, which had urinals in them, and which had what form of flush control, if any. Of the control devices already in situ, it was apparent that the most frequently used was the Cistermiser Infra Red (IRC); from service records it was also clear that these presented few service issues. Consequently, Cistermiser were invited to discuss ways of reducing water consumption across the property portfolio.

Solution

Initial discussion satisfied Estate Management that the first priority was to fit controls to currently uncontrolled cisterns, this would achieve a pay-back of less than a year. If they did nothing,the metered bill for the next 12 months would be greater than the combined cost of having controls fitted. To minimise cost and time involved in installation, battery-power was preferred to mains power. Further objectives were agreed:

Outcome

A full survey, involving every building within the University property portfolio, was conducted and all Gents toilets with urinals were logged. Recommendations were offered for each such toilet, indicating number of IRC's required, positioning of sensors, actions required re existing controls etc. To complete the first phase, 100 IRC's were installed on previously uncontrolled cisterns, during Summer 2005. It is estimated that the resultant annual reduction in metered charges will be some £25k, compared to a budgeted cost of less than £20k, i.e. pay-back achieved within 9 months. Concurrent with the installation of new IRC's, 78 existing IRC's were checked, flow rates re-set as necessary and batteries changed.

Site designed and developed by viplondon
A Davidson Holdings Ltd company